WX Creations
8 Heng Mui Keng Terrace

Project · 17

8 Heng Mui Keng Terrace

8 Heng Mui Keng Terrace

The arched veranda here was stripped back before it was made good — the floor in the before photo shows exactly what came off, sheet after sheet of failed paint.

Once the arch and soffit had been re-skimmed and floated flat, the whole run went back to white, with the wrought-iron grille and gate worked around in place. The curve is what makes it: an arch shows every ripple the moment light rakes across it.

Services involved

  • Painting Works
  • Plastering Works
  • Minor Dismantling Works

Before / after

Same room. Different story.

Drag the handle to scrub between two moments of this project.

More from this project

8 Heng Mui Keng Terrace — 18 Heng Mui Keng Terrace — 2

Get in touch

Ready to transform your space?

Tell us a little about your project. We typically respond within one business day.

We typically respond within one business day.